
The foundation has been prepared for the concrete to be poured. Two inch insulation board has been installed over the entire area where the concrete floor will be. A vapor barrier and wire mesh has been added to complete the preparation.
This is an account of construction progress on a modern affordable single family home designed for LEED for Homes certification. You'd think the background would be green, but we went black. Why you ask? Because with a black background we are reducing the energy your computer monitor requires right now.
No comments:
Post a Comment