Wednesday, August 26, 2009

Site Preservation


The Site Preservation Plan has been implemented as part of LEED-H requirements. This improves the quality and reduces the quantity of stormwater runoff during construction. Miss Utility has completed their markings and ground breaking will occur soon.

Monday, August 10, 2009

Site Preparation


As work continues on the building plans, temporary power and signage have been erected on the lot.

Thursday, August 6, 2009

Existing Site


The existing site is rectangular in shape and has 50' of frontage on W 30th Street and 105' of frontage on Colonial Ave.

Tuesday, August 4, 2009

Design Charrette



Collaboration between GreenBuildIt team members and sub contractors has been occurring for months. Pictured is a design charrette held to help incorporate as many sustainable features as possible. This facet of integrated design contributes points in the LEED system.